Completed in 2021, this new school in Virginia Beach needed stabilization before the new school year. ECS was brought in to amend the exiting topsoil with hydraulically applied compost, and then seed all areas with specified fescue blend. All sports turf areas were hydroseeded and verge areas stabilized with sod.